SR. NO. | NAME OF THE COMPANY / REPEAT ORDERS RECEIVED | SERVICES OFFERED | DETAILS OF JOB EXECUTED |
1 | PT Punj Llyod., Indonesia November 2010 |
Testing and Commissioning | Deputation of Engineer to ABB Vietnam works for factory Acceptance Testing (FAT) of following Transformers. 1. 2 Nos. 40MVA, 66/11 kV 2. 1 No. 12MVA, 66/20 kV 3. 2 Nos. 10MVA, 11/6.9 kV 4. 3 Nos. 2.5MVA, 6.6/0.4 kV. |
2 | Punj Lloyd PTE Ltd. / PT. Makmur Sejahtera Wisesa (MSW), Indonesia 2010 |
Consultancy Services | Providing Electrical Engineering Consultancy Services for 2 X 30 MW, Coal fired Power Plant project at Tanjung – Tabalong, Indonesia. |
3 | PT Indorama Synthetics Tbk, Indonesia October 2014 |
Testing and commissioning | 1. 2 x 30 MW Chinese power plant, Chinese make relay testing. 2. Testing and commissioning of 2 Nos. 100 MVA transformer. |
March 2014 | 220 kV switchyard bay and its equipments. | ||
Testing and commissioning | Testing of Grid Islanding and Load Shedding Scheme and its protection relays. | ||
July 2008 | Testing and commissioning | Testing and commissioning of Grid Islanding and Load shedding scheme for 2 x 30 MW CPP. | |
May 2008 | Testing and commissioning | Testing of 30 MW Unit-I for, 1. CTs, PTs. 2. Chinese Generator protection relay. 3. Chinese Generator transformer protection relay. 4. Generator differential stability and sensitivity schemes. 5. Overall differential protection stability sensitivity scheme. 6. Electrical system protective relays. |
|
Testing and commissioning | Testing of Protective Relays and Schemes. UNIT 1. | ||
2012 | Consultancy Services | Site visit and summarizing Analysis of Major Faults in Indorama Power Plant. | |
2009 | Testing and Commissioning and Condition Monitoring | Site visits and Occurrence Review. | |
2009 | Testing and Commissioning | 1. Testing of Protective Relays and Schemes for Unit-1 & Unit-2. 2. Condition Monitoring Testing of 30 MW, Unit-I and 2 x 10 MVA, HT Auxiliary Transformer. 3. Testing and Commissioning of Grid Islanding and Load Shedding Scheme. |
|
2008 | Consultancy Services | Our Scope of work includes the following, 1. Load flow study. 2. Short circuit study. 3. Relay setting and relay co-ordination study. |
|
2008 | Testing and Commissioning | Power System Study for the electrical system including : 1. Short circuit study. 2. Relay Setting and Co-ordination of 30 x 2 MW Power Plant. 3. Unit protection settings 4. Transient Stability Studies. 5. Design Engineering of Grid Islanding Scheme (GIS) and Load Shedding Scheme (LSS). |
|
2008 | System Study | Our Scope of work includes the following : 1. Load flow study. 2. Short circuit study. 3. Relay setting and relay co-ordination study. |
|
2007 | System Study | Power System Study for the electrical system including : 1. Short circuit study. 2. Relay Setting and Co-ordination of 30 x 2 MW Power Plant. 3. Unit protection settings. 4. Transient Stability Studies. 5. Design Engineering of Grid Islanding Scheme (GIS) and Load Shedding Scheme (LSS). |
|
2008 – 09 | Condition Monitoring Testing | Condition monitoring testing of Generator Stator, Rotor, Exciter, Generator Transformer and HT Auxiliary Transformer for Unit-1 and Unit-2. | |
System Study | Design Engineering Services : The Scope of work shall includes, 1. I. Review of AC schematics and CT connection diagrams for, i. Generator differential protection. ii. Generator transformer overall differential protection. II. Work out the summary of final settings to be adopted for both Differential Protections Scheme. III. Review test results of CT testing and scheme testing during implementation. 2. Introduction of “37 Low Forward Power Protection Scheme” : Carry out the pre-engineering for introduction of low forward power protection for Class- B tripping and working out setting. 3. Engineering of redundant GIS Protection Scheme : I. Prepare the Programmable Scheme Logic (PSL) of relay for the implementation of GIS schemes within the relay. II. Work out GIS Setting for redundant scheme logic. |
||
4 | PT IndoRama Polychem, Indonesia (IPCI) 2013 |
Consultancy Services | Carrying out Power System Study of Electrical Distribution System of CP-4. The scope of work includes, 1. Review of existing protection application, identify deficiencies if any in protection application and suggest missing protection. Provide functional specification for additional relays suggested. 2. Carrying out Short Circuit Studies at various location in electrical distribution system for normal operating condition to identify the Phase to Phase and Phase to Ground Fault Current. 3. Carry out, i. Phase Fault Relay Co-ordination and ii. Ground Fault Relay Co-ordination. 4. Work out Unit Protection settings for, i. Generators, ii. Transformers, iii. MV Motors, iv. LV Motors. 5. Load Flow study. 6. Review of Grounding Method and its operating practice. 7. Engineering Grid Islanding & Load Shedding Scheme for continuous parallel operation. |
5 | PT IndoRama Ventures, Indonesia (IVI) 2013 |
Consultancy Services | Carrying out Power System Study of Tangerang Project. 1. Review of existing protection application, identify deficiencies if any in protection application and suggest missing protection. Provide functional specification for additional relays suggested. 2. Carrying out Short Circuit Studies at various locations in electrical distribution system for normal operating condition to identify the phase to phase and phase to ground fault current. 3. Carry out, i. Phase Fault Relay Co-ordination and ii. Ground Fault Relay Co-ordination 4. Work out Unit Protection Settings for, i. Transformers, ii. MV Motors, iii.LV Motors. 5. Load Flow study. 6. Grid Islanding and Load Shedding Scheme & Synchronizing Scheme. 7. Carry out Transient Stability Study with Background Load Flow Study. 8. Review of existing PLN1 + CPP. |
6 | PT. INDO BHARAT RAYON LTD., Indonesia 2004 |
System Studies | Scope of Work includes, 1. Rationalization of Electrical Power Distribution. 2. Detail engineering of Power evacuation for new 2 x 10.8MW CPP 3. Rationalization of Power Source Grounding System. 4. Carryout Transient stability studies, load flow study, short circuit study and Relay co-ordination study. 5. Design and engineering of Grid Islanding scheme and post islanding Load shedding schemes. |
7 | PT Citra Kusuma Perdana, Sangatta, East Kalimantan, Indonesia 2011 |
Consultancy Services | Consultancy Services for Electrical Power System Study of 3 X 18 MW Coal Fired Steam Power Plant. |
8 | P.T. Polysindo Eka Perkasa, Indonesia 1998 |
System Study | Working of complete electrical system, short circuit, load flow, stability and protective relay settings and co-ordination on software. |
9 | Egyptian Propylene & Polypropylene Co., Cairo, Egypt 2013 |
Consultancy Services | Analysis of Tripping of 220 kV Line Feeder. |
10 | CHEMAF S.P.R.L. (Usoke Plant), Democratic Republic of Congo, Lubumbashi 2012 |
System Study | Scope of work includes carrying out Load Flow Studies on ETAP software. |
2012 | System Study | Part – I : Studies for 220 kV switchyard : • Preparation of Single line diagram, designing basic ratings of equipment and Electrical system distribution. • Study for selection of Distribution Voltage of 33 kV or 11 kV. • Preparation and submission of purchase specification for the equipments. • Technical tender analysis of vendor’s offer. • Carrying out Power System Studies: 1. Load Flow 2. Short Circuit and 3. Relay Setting, relay co-ordination for phase fault and earth fault. Part – II : Power System Study for New Process Plants : • Define Transformer voltage ratio, Vector Group and % impedance. • Carry out short circuit study to work out, 1. Short Circuit rating of Switchgear and Neutral Grounding Method 2. Voltage dip studies for Motors • Carry out feasibility study for emergency transfer of power • Prepare purchase specification for Transformer and Motor |
|
2008 | System Study | Feasibility study of Load Flow, Short Circuit and Relay Co-ordination of existing Plant electrical distribution system and upgrading the same with upcoming new requirements / projects. | |
11 | KNPC Mina Abdulla Refinery, Eartha / Kremenco 2011 |
Consultancy Services | Engineering consultancy work for selection of Current Transformers for the Differential Protection of Recycle Gas Compressor Motor. |
12 | Shadeed Iron & Steel LLC (Jindal Shadeed), Oman 2011 |
System Study | Relay Setting & Relay Coordination study |
13 | Alghanim International General Trading & Contracting Co. W.L.L., Kuwait 2011 |
Consultancy Services | Investigation for the tripping of 131.13 KVA ESP Transformers at KNPC, Kuwait, MAA Refinery. |
14 | KAMAL Engineering Consultants, Dubai 2008 |
System Study | Relay Setting, Relay Co-ordination and Harmonic Analysis for District Cooling Plant Project. |
15 | Abu Dhabi Oil Refining Company, Takreer 2009 |
System Study | Relay Setting, Relay Co-ordination study for electrical system of Abu Dhabi Oil Refinery, Ruwais Sulphur Expansion Phase III project. |
16 | Hajar Trading & Technical Services, Kingdom of Bahrain 2007 |
Testing and Commissioning | Modification and Overhauling of 11 kV Medinsha VCB’s for Bahrain MEW. This includes carrying out, 1. Wiring modification of auxiliary switches for Meidensha Make VCB’s, Type VFT-12 and 2. Modification to replace existing auxiliary contact (Finger contacts) block. |
17 | Emirates Trading Agency L.L.C., Associated Constructions & Investments Co., L.L.C., U.A.E. 2007 |
Consultancy Services | Deputation of Senior Executive for providing Consulting Services in connection with ALBA – RST Failure. |
18 | SAUDI BASIC INDUSTRIES CORP. (SABIC), Saudi Arabia 2006 |
Detail Engineering | Detail engineering for upgradation of existing UPS system for IT Department. This includes, 1. Study / evaluate existing UPS power system network and suggest rating of new UPS. 2. Preparation of technical specifications, drawings for the new equipments. 3. Preparation of drawings for layout of equipment, cable tray layouts etc. 4. Preparation of specifications for engineering package. |
19 | JOINT OPERATIONS, Wafra, Kuwait 2005 |
System Study | Relay co-ordination study for electrical system of Water Disposal Phase III Drain Recycling facility. |
2005 | System Study | Electrical system study of Wafra electrical system including, Short circuit study. 1. Relay setting and co-ordination. 2. Load flow studies and steady state voltage drop studies. Calculate Sag and Tension for 34.5 kV and 13.8 kV transmission lines. |
|
20 | Heavy Engineering Industries Shipbuilding Co. (K.S.C), Kuwait for KNPC 2005 |
Testing and Commissioning | Testing and Commissioning of 3.3 kV feeder for new 3.3 kV / 460 V Transformer of Sludge Handling Plant. |
2004 | System Study | Study of Relay setting and relay co-ordination for the electrical system of Sludge Handling Plant | |
21 | Fiji Electricity Authority, FEA,Fiji 2003 |
System Study | Study of voltage profile, VAR compensation, stability and Relay setting and relay co-ordination for the Wainekasou and Wailoa sub-station electrical system. |
22 | Kuwait National Petroleum Company , Kuwait 2005 |
System Study | System study for Mina Abdulla Refinery electrical distribution system including, 1. Short circuit study. 2. Relay setting and co-ordination. 3. Unit protection settings of synchronous motor, synchronous generator, transformers etc. |
2005 | Consultancy services | Consultancy services during project execution of revamping of Frequency Converter system. This includes review of documents prepared by vendors and advise KNPC on various detail engineering issues related to this project. | |
2004 | System Study | Relay setting and Co-ordination study for electrical system of Sludge handling plant. | |
2003 | System Study | Study of current collector and speed variation technique and suggest improvement for bridge crane unit 47. | |
2003 | System Study | Study of protection relay co-ordination and readjustment of protective relay setting at MAB refinery. | |
2002 | Consultancy Services | Consultancy Services for Revamp of Frequency Conversion System for Reliability. The scope of work was, 1. Evaluation of Critical Clearing Time for faults in utility and revision of Synchronous Motor – Generator relay settings accordingly. 2. Up gradation of Protection logic for Synchronous Motor – Generator Set (Frequency Conversion unit) 3. Detail engineering for implementation of suggested schemes for reliability improvement. |
|
23 | Kuwait Oil Company , Kuwait 2002 |
System Study | Scope of work for the system study includes, 1. Carry out System Fault analysis with new machines to check the adequacy of the existing rating of switchgears. 2. Review of Integrated Protection Scheme for H.T. Motors. 3. Determine the adequacy of existing generator ratings. |
2002 | Consultancy services | Cable sizing calculation for new crude export pipeline from NK to CMM | |
24 | Petrochemical Industries Corporation , Kuwait 2002 |
System Study | Consultancy services for Electrical system modification. |
25 | TCL INDUSTRIES (MALAYSIA) SDN BHD, Malaysia 1998 |
Power Plant | 7 MW steam based power plant, detail engineering, Testing & Commissioning and complete system study. |