SR. NO. | NAME OF THE COMPANY / REPEAT ORDERS RECEIVED | SERVICES OFFERED | DETAILS OF JOB EXECUTED |
1 | Jakson Ltd., New Delhi | Testing and Commissioning | Live Phasing Out Test at Vedanta, Jharsuguda for their Black Start DG Sets Project. |
2 | Korean Power Service Ltd., Korba | Testing and Commissioning | Testing of Relay, CT’s, PT’s, Breakers, VCBs and ACB for 135 MW Unit-3. |
Testing and Commissioning | Testing of Relay, CT’s, PT’s, Breakers, VCBs and ACB for 135 MW Unit-1. | ||
3 | M/s. Eurotex Industries and Exports Ltd., Kolhapur | Testing and Commissioning | Investigation of reason for unbalance current observed in MSEB feeder when Captive power plant, D.G. Sets operate in parallel with MSEB. |
Testing and Commissioning | (1 x 3MW ) + ( 1 x 4MW ) D. G. Power Plant. 1. Detail engineering, 2. Site erection supervision, 3. Testing – Commissioning |
||
1997 | Testing and Commissioning | Investigation of reason for unbalance current observed in MSEB feeder when Captive power plant, D.G. Sets operate in parallel with MSEB. | |
4 | M/s. Hofincons Infotech & Industrial Services Pvt. Ltd., Korba June 2006 |
Testing and Commissioning | Testing of Relay, C.T.s, P.T.s, Breakers, VCBs and ACB for Unit-1 (135 MW) at BALCO, Korba site. |
July 2006 | Testing and Commissioning | Testing of Relay, C.T.s, P.T.s, Breakers, VCBs and ACB for Unit-2 (135 MW) at BALCO, Korba site. | |
Testing and Commissioning | Testing of Relays, C.T.s, P.T.s, Breakers, VCBs and ACB for BALCO, 135 MW Unit # 4. | ||
July 2009 | Testing and Commissioning | Testing of Relays, C.T.s, P.T.s, Breakers, VCBs and ACB for BALCO, 135 MW Unit # 3. | |
Testing and Commissioning | Testing of Relays CTs, PTs, Breakers ACB, VBs for Balco 540MW CPP. | ||
5 | M/s. Indian Dyestuff Industries Ltd., Ranoli | Testing and Commissioning | 33KV Switchyard, 2.5MVA and 5MVA transformers. |
6 | M/s. Indian Dyestuff Industries Ltd., Ranoli | Testing and Commissioning | 33KV Switchyard, 2.5MVA and 5MVA transformers. |
7 | M/s. National Organic Chemical Industries Ltd., Thane | Testing and Commissioning | 12.5MVA and 50MVA Transformers at their 100KV Switchyard. |
8 | Evans Electrical Pvt. Ltd., Palghar January 2014 |
Condition Monitoring Testing | Condition Monitoring Testing of 67.5 MW Generator Rotor RSO. |
9 | Vadinar Power Company, (Essar Project – Jamnagar) August 2012 |
Condition Monitoring Testing | Condition Monitoring Testing of, 1. 92 MW, 105 MW, 130 MW STG’s. 2. 63.5 MVA, 2×140 MVA and 2×27.5 MVA Power Transformer. 3. 5 nos. 3.2 MW Motors. |
10 | Essar Power Ltd., Hazira July 2008, November 2008 |
Condition Monitoring Testing | Offline Partial Discharge Measurement on CTs and PTs of 3 Nos. Generators and electrical system (6.6 kV). |
2000, 2001, 2002 | System Testing | 500MW IPP Complete Electrical System Testing. | |
August 2008 | Testing and Commissioning | Testing of 185 MW, 15 kV STG for : 1. Generator protection relays, 2. 220 kV generator transformer protection relays, 3. CTs, PTs, IPCTs, IVTs and 4. Generator differential, overall differential and REF stability sensitivity schemes. |
|
July 2008 | Testing and Commissioning | 110 MW, GTG # 3 GCP and CRP Relay Testing. | |
December 2005 | Testing and Commissioning | Testing-commissioning of 55MW SIEMENS Make, STG for 155 MW combined cycle Power Plant and its associated electrical System equipments. | |
May 2005 | Testing and Commissioning | RTesting and Commissioning of 100 MW HITACHI Make Gas Turbine Generator, its associated electrical system including protection relays and related instrumentation. | |
Testing and Commissioning | 500 MW IPP Complete Electrical System Testing. | ||
Testing and Commissioning | Testing and commissioning of 130MW STG-2. | ||
11 | Essar Projects India Ltd., Jamnagar November 2010 |
Condition Monitoring Testing | Condition Monitoring testing (C, tan d, RSO etc) of 2 x 110 MW CPP equipments, 2 Nos. Generators, 2 Nos. Transformers and 8 Nos. HT Motors. |
12 | Essar Power Ltd., Salayaa | Condition Monitoring Testing | Condition Monitoring Testing of, 1. 2 Nos. 600 MW Generators and 2. 30 Nos. H.T. Motors. |
December 2011 | Testing and Commissioning | Testing and Commissioning of 2 x 600 MW Power Plant Scope of work includes, 1. Testing of Current Transformer / Potential Transformer 2. Testing of Protective Relays. 3. Testing of current operated Differential Protection Scheme. 4. Testing of Auto Transfer scheme. |
|
September 2011 | Testing and Commissioning | Testing and commissioning of 2 x 110 MW CPP for Essar Oil Ltd., Vadinar through Essar Projects India Ltd. Scope of work includes, 1. Testing of protection relays. 2. Testing of current transformer and potential transformer by primary and secondary injection. 3. Checking of protection scheme, control circuits and logics as per drawings. 4. Carrying out stability and sensitivity checks for current differential protections. 5. Load dynamics, no load dynamics and power dynamics. |
|
Condition Monitoring Testing | Frequency Response Analysis of 80 MVA, 230 / 33 kV WYE/WYE/ Delta (Tertiary) transformer (2 Nos.). | ||
Testing and Commissioning | Testing and Commissioning of electrical system for 2 x 38.5 MW Power Plant for the Essar Oil Refinery Project, Vadinar. | ||
13 | Philips Carbon Black Ltd., Mundra August 2012 |
Condition Monitoring Testing | On Line Tests of 9 nos. 66 kV Lightning Arrester. |
14 | Century Enka Ltd., Pune January 2010 |
Condition Monitoring Testing | 1. Condition Monitoring testing of 2 x 6 MW, 6.6 kV Wartsila Make DG. 2. Condition Monitoring Testing of Power Transformer. i. 2 x 25 / 31.5 MVA, Power Transformers. ii. 3 x 7.5 MVA, Power Transformers. iii. 7 x 1 / 1.5 MVA Distribution Transformers. 3. Condition Monitoring testing of Cables by VLF testing. i. 15 Nos., 3 core, 22 kV Cables. ii. 15 Nos., 3 core, 6.6 kV Cables. iii. 14 Nos., 1 core, 6.6 kV Cables. 4. Online testing of 6 Nos. 220 kV Lightning Arrester. 5. Condition Monitoring testing of 6 Nos. 220 kV Current Transformers. 6. Condition Monitoring testing of 6 Nos. 220 kV Potential Transformers. 7. Condition Monitoring testing of 6 Nos., 245 kV SF6 Breakers. 8. Condition Monitoring testing of 22 kV SF6 Breakers. |
January 2012 | Testing and Commissioning | Scope of work includes carrying out harmonic measurement at Various location and its analysis of electrical system. | |
March 2011 | Testing and Commissioning | Testing and Commissioning of 2 x 6.375 MW GEG switchgear and its associated electrical system. | |
October 2010 | Testing and Commissioning | Testing and re-commissioning of 31.5 MVA, 220 / 20 kV Grid Transformer-1, 220 kV CT, CB, LA and Protective relays after fault. |
|
January 2010 | Testing and Commissioning | 6 MW, DG-2 Trouble Shooting for Mal-operation of Generator Differential Protection. | |
March 2010 | Testing and Commissioning | Testing and commissioning of 220 kV CVT’s and Testing of 6.6 kV Motor Protection relays. | |
November 2009 | Testing and Commissioning | Testing and re-commissioning of following equipments of 220 kV switchyard bay-1 and bay-2. 1. 2 Nos. 31.5 MVA, 220 / 22 kV Transformer. 2. 220 kV CT’s, 220 kV PT’s and 22 kV switchgear. 3. 220 / 22 kV system protective relays. |
|
February 2008 | Testing and Commissioning | Testing of Electrical system protective relays, CT’s and PT’s at 22 kV and 6.6 kV. | |
January 2007 | Testing and Commissioning | Testing of electrical system Protective Relays, C.T.s, P.T.s. | |
May 2006 | Testing and Commissioning | Testing of electrical system, Protection Relays, Current Transformers, Potential Transformers done by Primary & Secondary Current Injection Method. | |
June 2003 | Testing and Commissioning | Testing of Electrical System, Protective Relays, Current Transformer and Potential Transformer. | |
Testing and Commissioning | Testing of Electrical System, Protective Relays, Current Transformer and Potential Transformer. | ||
Testing and Commissioning | Testing of Relay. | ||
Testing and Commissioning | 25MVA, 220/22KV Transformer and associated electrical system equipments. | ||
March 2010 | Condition Monitoring Testing | Condition Monitoring testing of Cables by VLF testing. 1. 15 Nos., 3 core, 22 kV Cables. 2. 15 Nos., 3 core, 6.6 kV Cables. 3. 14 Nos., 1 core, 6.6 kV Cable. |
|
2005, 2006, 2007 | Relay Testing | Testing of Electrical System, Protective Relays, Current Transformer and Potential Transformer. | |
2004 | Reliability Improvement Exercise | Testing and Commissioning of 6.0 MW Power Plant and its Associated Electrical System. | |
15 | Gujarat State Electricity Generation Board 2008, 2009, 2010, 2011, 2012 |
Condition Monitoring Testing | Online Leakage Current Measurement of 220kV Metal Oxide Surge Arresters. |
April 2010 | Condition Monitoring Testing | Condition Monitoring Testing of, 1. 70 MVA, 220 / 11.5 kV Generator Transformer – 1 2. 6 MVA, 11.5 / 6.9 kV Station Transformer – 1 3. 4 / 2.75 / 1.25 MVA Unit Auxiliary Transformer – 1 4. 3 Nos. 220 kV Current Transformer of Bay-1. |
|
March 2008 | Condition Monitoring Testing | Offline Testing of 220kV Switchyard Bay-2 CTs and GT-12 Generator. | |
April 2007 | Condition Monitoring Testing | Condition Monitoring testing of 55 MW, 11 kV Alstom Make GTG-11 Generator. | |
Condition Monitoring Testing | 70 MVA, 220KV/ 11.5 KV, ALSTOM make Power Transformer. | ||
16 | Bhander Power Ltd., Hazira March 2009 |
Condition Monitoring Testing | Online Leakage Current Measurement of 10 bays of 220kV Metal Oxide Surge Arresters. |
17 | BVL Power Systems Pvt. Ltd., Hyderabad January 2008 |
Condition Monitoring Testing | Condition Monitoring Testing of 16.5MW, 6.6kV, Generator at Grasim, Nagda. |
18 | MSEB, Chandrapur | Condition Monitoring Testing | 300 MVA, 400KV/ 211KV /211KV, ABB make Converter Transformer of 500KV HVDC line |
19 | ABB Ltd., Deonar Works | Condition Monitoring Testing | 3.3 kV G.E. motor. |
20 | M/s Jindal Praxair Ltd., Bellari | Condition Monitoring Testing | 3 Nos. 6.75MW, 11 kV Synchronous Motors. |
21 | Reliance Energy Ltd., Goa | Condition Monitoring Testing | 1. 30 MW, 11kV GTG and 2. 37 MW, 11kV STG. |
22 | NTPC, Kawas | Condition Monitoring Testing | 110MW, 11kV GEC Alstom Make GTG. |
23 | IOT Infrastructure & Energy Services Ltd., Mumbai January 2012 |
Design | Detail Engineering Services for Electrical and Instrumentation System. 1 x 300 MW Power Plant for Maruti Clean Coal & Power Ltd. 1. Preparation of Electrical System single Line Diagram and Instrumentation PID. 2. Procurement Services: This includes, i. Preparation and submission of Electrical and Instrumentation equipment specification for CHP plant. ii. Review of the technical offers received from vendors and submission of technical tender analysis and recommendations. 3. Carrying out Detail Design Engineering related to, i. Preparation of single line diagram including protection system and Instrumentation PID. ii. Electrical equipment layout engineering. iii. Power and control Cable engineering. iv. Earthing system engineering. v. Lighting system engineering. vi. Lightning protection engineering. vii. Interconnection diagrams for control function. viii. Protection system setting and coordination. ix. Instrumentation system: Preparation and submission of IO list. Preparation and submission of instrumentation logic. Preparation and submission of interconnection wiring diagram. 4. The review of Vendor Drawings. |
24 | Ruby Mills Limited., Mumbai July 2008 |
Consultancy services | Consultancy services for electrical distribution system for a new Textile Process House at Khopoli. This includes, 1. Preparation of Detail Single Line Diagram, indicating protections, metering and rating of equipments etc. 2. Preparation of purchase specifications. 3. Detail Design Engineering for, i. Lighting system design. ii. Earthing system design. iii. Equipment layout drawings. iv. Cable tray / trench layout. iv. Cable schedule and interconnection diagram 4. Preparation of drawings / documents for statutory approval. |
25 | Emami Paper Mills Ltd., Balasore, Orissa 2004 |
System study | Power System Study for electrical distribution system including : 1. Short Circuit Study 2. Relay Setting and Co-ordination 3. Unit Protection Settings. |
September 2006 | Design | Review of detail design engineering of 1 x 15 MW Captive Power Plant Electrical System and 132 kV Switchyard. | |
August 2007 | Testing and Commissioning | Testing-commissioning of 15MW Generator and 132 kV / 11 kV Power Transformer, 11 kV switchgear. | |
March 2007 | Testing and Commissioning | Testing and Commissioning of HT switchgears. 1. 11 kV panels. 2. 6.6 kV panels. 3. 132 kV switchyard and 4. Generator Relay and Control Panels. |
|
26 | M/s. Bombay Dyeing and Mfg.Co. Ltd., Patalganga | Testing and Commissioning | 220KV Switchyard and its associated equipments. |
November 2004 | Feasibility study | Feasibility study to check the adequacy of existing 220 kV system equipment to take care of start up and running loads considering the existing load and additional load. | |
27 | Melco India Pvt.Ltd., Faridabad, New Delhi | Design | 2 x 210 MW, Panipat Thermal Power Plant Ash handling plant Electrical system review, Design and engineering |
28 | Birla Cellulosic, Kosamba Consultancy, Commissioning and supervision Services |
Testing and Commissioning | 2 x 15MW Co-Generation Power Plant 1. Detail design engineering. 2. Site-erection supervision. 3. Testing – Commissioning of power plant and its electrical system equipments. |
29 | The Associated Cement Companies Limited, Chaibasa Cement Works 2005 |
Testing and Commissioning | Testing and Commissioning of new cement plants : Relays, CT’s, PT’s, Controls Check and Schemes. |
30 | Grasim Industries Ltd., Harihar March 2013 |
Testing and Commissioning | Testing of Current Transformers and Protection Relays of Electrical System. |
February 2011 | Testing and Commissioning | Testing relays and Current Transformers at 66 kV switchyard and 11 kV MSS. | |
February 2005 | Testing and Commissioning | Testing of electrical system protective relays. | |
March 2004 | Testing and Commissioning | Testing and calibration of IDMT Relays together with primary & secondary injection tests. | |
May 2003 | Testing and Commissioning | Testing and Calibration of Complete Plant Electrical System Protective Relays. | |
2005 | Annual Protection system checks | Annual protection system checks with switchgear transformers, Generators, protection schemes and protection relays. | |
31 | Grasim Industries Ltd., Nagda May 2005 |
Condition Monitoring Testing | Condition Monitoring Testing of, 1. 40MW, 11kV, Bhel Make Generator 2. 12.5 MVA, 22/6.6 KV Power Transformer 3. 6.25 MVA, 22/6.6 KV Power Transformer 4. 3.0 MVA, 33/6.6 KV Power Transformer 5. 45 MVA, 11/22kV Power Transformer 6. 2 x 10 MVA, 11/6.6kV Power Transformer. |
2004 | Testing | Our Scope of Work includes, Testing of protection scheme for 6.6 kV, 12.8 MW GDR Generator. | |
2004 | Testing and Commissioning | Our Scope of Work includes, 1. Testing and Commissioning of New 5.515 MW TG set and its Associated Protective relays. 2. Testing of electrical system for EC – 1, 16.5 MW TG set. |
|
1999, 2001, 2003 | System Study for Captive Power Plant | Electrical System Study including, 1. Load flow studies 2. Short circuit studies 3. Grid Islanding and Under frequency Load Shedding 4. Relay setting and relay co-ordination. |
|
Reliability Improvement Exercise | Testing of complete plant protective relays. | ||
1996, 1997, 1998, 1999, 2000, 2001 | System Study | Relay setting and co-ordination of 40MW power plant and electrical protection system. | |
Power Plant | Testing and Commissioning of 40MW co-generation power plant. | ||
Reliability Improvement Exercise | Electrical system equipments / protective relays servicing, testing, calibration for EC-1, 12.5MW & 16.5MW T.G. sets. | ||
Testing and Commissioning | Testing of Relays at 30 MW (EC-1 & EC-2) Power Plant. | ||
October 2004 | Testing and Commissioning | Testing of 40 MW STG, its protective relays, C.T’s, Control Scheme and its associated electrical system. | |
August 2005 | Testing and Commissioning | Testing and Commissioning of 40MW co-generation power plant. | |
December 2007 | Design | Power System Design for the electrical system including: 1. Review and approval of detail single line diagram of proposed 30 MW TG set electrical distribution system. 2. Review and approval of hookup of new 30 MW TG set with existing electrical system. 3. Suggest scheme for load sharing with existing TG sets. 4. Suggest better alternative if any. |
|
August 2003 | Design | 1 x 40MW Co-Generation Power Plant. 1. Relay setting and Co-ordination of Power Plant & electrical Protection system. 2. Testing – Commissioning of power plant & its electrical system equipments. |
|
32 | DCW Limited, Dhrangadhra 1998 |
Reliability Improvement Exercise | Checking and Testing of EE, ABB make protective relays of 3.45MW BHEL T.G. set. |
33 | Hindustan Lever Limited, Andheri – Mumbai 2004 |
Relay Testing and Calibration | Testing and Calibration of Protective Relays. |
1988, 1990, 1992, 1995, 1998, 2001, 2003 | Reliability Improvement Exercise | Testing and Calibration of electrical system protective relays. | |
2003 | System Study | Review of complete existing system protective relay settings and co-ordination on software. | |
April 1999, April 2003, October 2004 | Testing and Commissioning | Testing and Calibration of Electrical System Protective Relays. | |
34 | Hindustan Lever Ltd., Sumerpur February 2005 |
Design | Preparation of detailed single line diagram of existing electrical system. |
35 | Hindustan Lever Limited, Nasik 2004 |
Reliability Improvement Exercise | Testing and Commissioning of complete Electrical System. |
36 | Hindustan Lever Ltd. (HUL), Dapada, Silvassa August 2011, November 2013, October 2014 |
Testing and Commissioning | Testing of CT’s, PT’s and Protection Relays. |
Testing and Commissioning | Testing and Calibration of Electrical System Protective Relays. | ||
2004 | System Study | Power System Study for electrical distribution system including : 1. Short Circuit Study 2. Relay Setting and Co-ordination 3. Unit Protection Settings. |
|
2003 | Relay Testing and Calibration | Testing and Calibration of Electrical System Protective Relays . | |
37 | Hindustan Lever Limited, Sewree – Mumbai 2004 |
Relay Testing and Calibration | Testing and Calibration of Protective Relays. |
1988, 1990, 1992, 1995, 1998, 1999, 2000, 2001 | Testing and Commissioning | Testing and calibration of electrical system protective Relays | |
38 | Hind Lever Chemicals Limited, Midnapur 2004 |
System study | Power System Study for electrical distribution system including : 1. Short Circuit Study 2. Relay Setting and Co-ordination 3. Unit Protection Settings of Transformer, Capacitor bank, Generator Protection Relays. 4. Review of existing distribution system and its protections and recommend the changes required for efficient and reliable distribution system. 5. Voltage Dip study for starting of large motors. 6. Transient stability study and steady state stability studies. 7. Feasibility Study For Parallel Operation Of CPP Units |
39 | HEG Ltd., Mandideep June 2011 |
Condition Monitoring Testing | Condition Monitoring Testing of CPP U-1, 1. 30 MW, 11 kV Generator. 2. 40 MVA, 34.5 / 11 kV Generator Transformer GT-1. 3. 6.3 MVA, 33 / 3.45 kV Auxiliary Transformer-1. 4. 2 Nos. 360 kV, 3.3 kV ID Fan Motors. |
2004 | Reliability Improvement Exercise | Testing and Commissioning of Tawa Hydroelectric Plant Electrical System. | |
40 | Schenectady Herdillia Limited, Navi Mumbai 2003 |
System study | Electrical System Study Including, 1. 3 Phase and 1 Phase Short Circuit Studies. 2. Relay Setting and relay Co-ordination. 3. Unit Protection Study. |
2004 | Relay Testing and Commissioning | Our Scope Of Work includes, Testing and Commissioning of New 6.6 KV Switchgear (CT, PT, Relay), Testing and Calibration of ABB Make Numerical (SPAJ) Relays. | |
41 | Unimers India Pvt. Ltd., Mumbai 2003 |
Relay Testing | Testing and Calibration of Electrical System Protective Relays. |
42 | Crompton Greaves Limited, Mumbai 2001 |
System study | Electrical system studies for working out Relay setting and relay co-ordination. |
43 | Moser Baer, Noida 2000 |
System study | Harmonics measurement analysis and System study. |
44 | Orient Paper Mills Limited, Amlai 2001 |
Relay Testing | Testing of electrical system protective relays and three phase energy meters under normal running load condition. |
July 2006 | Testing and Commissioning | Testing of Relays. | |
July 2001 | Testing and Commissioning | Testing of electrical system protective relays and three phase energy meters under normal running load condition. | |
45 | Tarapur Atomic Power Station, Tarapur 1989, 1990 |
Testing and Commissioning | 100 MVA and 260 MVA, 11/220KV Generator Transformer testing and commissioning. |
46 | Hindustan Motors Limited, Pithampur 1991 |
System study | Review of complete existing system protective relay settings and co-ordination on software. |
47 | Heavy Water Project, Kota 1990 |
Testing and Commissioning | Testing and Commissioning of electrical system of new steam generation plant. |
48 | M/s.National News Prints and Paper Mills, Nepanagar | Testing and Commissioning | Testing and Calibration of Electrical System Protective Relays. |
1989 | Reliability Improvement Exercise | Testing of protective relays. |