Given below is a list of Power System Study Projects and related Scheme Engineering Jobs executed by us: |
|
|
|
SR. |
NAME OF THE COMPANY |
DETAILS OF JOB EXECUTED |
|
110.0 |
Eartha General Trading and Cont. Co. W.L.L., Kuwait December 2011 |
Selection of Current Transformer (6 Nos) for the differential protection of Recycle Gas Compressor Motor (C-02-106M) at KNPC Mina Abdulla Refinery. Scope of Work : a. Working out fault current calculation for this motor feeder considering 13.8 kV Switchgear as a source. b. Working out the specification of current transformer for proper performance of Motor differential relay (ANSI device 87M) by carrying out C.T. Sizing calculation. |
|
109.0 |
Gujarat Fluorochemicals Ltd., Bharuch |
Consultancy Services for carrying out system studies for improving Flexibility, Reliability and Stability. ・ Flexibility Studies : a. Preparation of Key Single Line Diagram. b. Load Flow, Short Circuit, Transient Stability (Studies with Fault Current Limiter). c. Detail engineer and procurement specification of Fault Current Limiter. ・ Reliability Studies : a. Designing of GIS and LSS scheme. b. Preparation of GIS and LSS panel specification. ・ Stability Studies : a. Overall System Modeling. b. Short Circuit Study. c. Relay Setting and Relay Co-ordination. d. Working out unit protection settings for generators, transformers, HV motors, LV motors and outgoing power feeders. |
|
108.0 |
Cairn
Energy India Pty. Ltd. Barmer, Rajasthan
|
Consultancy services for carrying out Relay setting and Relay Co-ordination study of Raageshwari Gas Terminal. The scope includes, a. Preparation of Key Single Line Diagram. b. Carrying out Short Circuit Study. c. Relay setting and Relay Co-ordination. d. Working out Unit Protection for Generator, Transformers, HV Motors,
LV Motors and Outgoing Power Feeders. |
|
107.0 |
BG Exploration and Production India Ltd., PANNA Platform
|
Power system study and Power option study for extra power of ESD Migration. The scope includes, a. Steady state analysis. b. Motor starting study. c. Short Circuit Study. d. Power system adequacy check. e. Cable sizing and cable schedule. |
|
106.0 |
Manikgarh Cement Ltd., Gadchandur |
Consultancy services for carrying out System study for selection of voltage level for distribution of power at New cement plant. |
|
105.0 |
|
Consultancy services for carrying out Relay setting and Relay co-ordination study for Cement Line-1, Cement Line-2, TPP, 132 kV Grid and DGs. The scope includes, a. Preparation of Key Single Line Diagram. b. Carrying out Short Circuit Study. c. Relay setting and Relay co-ordination. d. Working out Unit Protection for Generator, Transformers, Tie Feeders,
HV Motors, |
|
104.0 |
|
Consultancy services for carrying out Relay setting and Relay co-ordination study for various substations of Cement plant at Ultratech Cement Ltd., Kovaya unit. The scope includes a. Preparation of Key Single Line Diagram. b. Carrying out Short Circuit Study. c. Relay setting and Relay co-ordination. d. Working
out Unit Protection for Generator, Transformers, Tie |
|
103.0 |
Petronet LNG Ltd., Dahej |
Consultancy services for carrying out Relay setting and Relay co-ordination study for LNG terminal at Dahej. The scope includes a. Preparation of Key Single Line Diagram. b. Carrying out Short Circuit Study. c. Relay setting and Relay co-ordination. d. Working
out Unit Protection for Generator, Transformers, Tie |
|
102.0 |
Ultratech
Cement Ltd. (TPP) Kovaya,
|
Consultancy services for Grid Islanding and Load shedding scheme for Ultratech Cement Ltd., Kovaya unit. The scope includes carrying out following activities. a. Carry out Load Flow Studies. b. Carry out Transient stability studies. c. Engineering a Grid Islanding and Load shedding scheme. d. Preparation of purchase specification for GIS and LSS panel. e. Review of Vendor drawings for GIS and LSS panel. f. Work out
Relay setting for GIS and LSS scheme relays based on |
|
101.0 |
Ambuja Cement Ltd., Bhatapara CPP |
The scope includes, Deputation of Sr. Technical Executive for analyzing trials taken on Governor and AVR. |
|
100.0 |
Indo Rama Synthetics (I) Ltd., |
Consultancy
Service for addition of 11 MW STG at Butibori,
The
scope includes, a. Preparation
of Key Single Line Diagram. b.
Short Circuit study. c.
Load flow study. d. Transient stability study. e.
Relay setting and Relay Co-ordination study. f.
Unit Protection of 11 MW Generator. g. Grid Islanding and Load Shedding scheme. |
|
99.0 |
Jindal
Steel & Power Ltd., Raigarh |
Our
scope of work includes, a. Transient Stability Studies. b. Detail engineering for Grid Islanding and Load Shedding scheme
(GIS- LSS). d
Technical Tender analysis of vendors offer for Grid Islanding and Load e.
Review of vendor drawings of GIS-LSS panel. f.
Preparing cable schedule and interconnection diagram for GIS-LSS |
|
98.0 |
Ultratech
Cement Ltd., |
Checking
the feasibility of providing the black start power supply to new TPP through
2 x 6 MW DG set at existing cement plant. This
includes, a) Sizing
the cables and the overhead lines, interconnecting DG set end b)
Sizing the transformer and its specification. c)
Defining the grounding and earthing system. d)
Designing the protection system for this black start link. e)
Checking the feasibility of switching IN the largest motor on one DG |
|
97.0 |
Jindal
Steel & Power Ltd., Raigarh |
Power
System study for hookup of new EAF at proposed 220kV switchyard. a.
Carry out Load flow study b.
Carry out Transient stability study to calculate critical clearance time
a) New 220 kV switchyard bus
b) New 33 kV bus c.
Transient stability studies to identify voltage profile during switching IN d Transient stability study to check the voltage
profile during momentary |
|
96.0 |
Ultratech
Cement Ltd., |
Relay
Setting and Relay Co-ordination study for 4 x 23 MW Power plant electrical distribution
system, from 220 kV GEB incomer at power plant up to
415 V MCC Incoming feeders. This
includes, a)
Preparation of key single line diagram with Data compilation report. b)
Short Circuit Study. c)
Relay Setting and Relay Co-ordination. d)
Working out unit protection settings for,
i) Generators.
ii) Power Distribution transformers.
iii) Tie feeders.
iv) 11 varieties HT Motors.
v) 220 kV and 66
kV line.
vi) 220 kV switchyard protection.
vii) LT Motors capacity higher than 90 KW. viii) PCC and MCC incomers. |
|
95.0 |
Abu
Dhabi Oil Refining |
Our scope of work includes carrying out relay co-ordination study and provide relay setting schedule for electrical system of Abu Dhabi Oil Refinery Ruwais Sulphur Expansion Phase III project. |
|
94.0 |
BG Exploration and Production India Limited, Panna. |
Consultancy services for starting of zero flare Gas compressor for Panna field. The scope includes a. Preparation of wiring or control schematic drawings b. Relay setting and Motor starting study with soft starter. |
|
93.0 |
Gujarat Ambuja Cements Ltd., Bhatapara Unit. |
Consultancy services for Grid Islanding and Load shedding scheme for GACL, Bhatapara unit. This scope includes carrying out following activities. a. Transient stability studies. b. Engineering load shedding scheme. c. Engineering grid islanding scheme. d. Work out back-up under frequency load shedding block. e. Work out Grid Islanding scheme relay setting. f. Work out load shedding scheme back up under frequency relay setting. |
|
92.0 |
ACC Limited, Kymore. |
Our scope of work includes, carrying out power system studies for the electrical system. Our scope of work includes, a) Load flow studies. b) Transient stability studies. c) GIS and LSS settings. |
|
91.0 |
ACC Limited, Kymore |
Our scope of work includes carrying out relay setting and relay co-ordination for 132 kV switchyard, 2 x 25 MW CPP, cement plant, The scope includes, a) Short Circuit study. b) Relay co-ordination study. c) Work out unit protection settings. |
|
90.0 |
Indo Rama Synthetics (I) Ltd., |
Consultancy
Service for addition of 37.5 MW STG at Butibori,
The
scope includes, a. Checking
feasibility for addition of new 37.5 MW STG and its power b.
Conceptualizing the electrical system through Single Line Diagram. c.
Feasibility study for Power evacuation route. d.
Load Flow study. e.
Checking Feasibility of Power evacuation of 37.5 MW power plant. f.
Short circuit study. g.
Sizing and rating of cables, power transformers, CT, PT Switchgears. h.
Billing and metering system for Import / Export of power. i.
Checking layout feasibility. j.
Estimating the requirement of earthing system. k. Evaluating the requirement of control, protection system. |
|
89.0 |
Emami Paper Mills Ltd., Orissa |
Power
System Study for existing electrical distribution system for parallel
operation of two TG sets (15 MW + 5 MW) and flexibility of re-distribution.
This includes, a)
Short circuit study results considering parallel operation of Grid + 15 MW
T.G. Set + 5MW T.G. Set b) Load
flow study results considering parallel operation of Grid + 15 MW c) Relay Setting and Relay Co-ordination for parallel operation of Grid + 15MW T.G. Set + 5 MW T.G. Set. |
|
88.0 |
Monnet Ispat & Energy Ltd., Raigarh |
Carrying
out following Power System studies for their system. This includes, i)
Load Flow Study. ii)
Short Circuit Study. iii)
Transient Stability study. iv)
Transformer Sizing. v)
Harmonics study. vi) Review of transformer protection. |
|
87.0 |
Essar
Oil Ltd., |
Our scope of work involves, carrying out Analysis for failure of 33 kV Current Transformers at FCCU substation and providing recommendation. |
|
86.0 |
Essar Oil Ltd., |
Carrying out Transient Stability studies, our scope of work includes, a) To check the behavior / survival of Generators. b) To
calculate and provide revised under frequency Load Shedding. |
|
85.0 |
Gujarat
Fluora Chemicals Ltd, Dahej |
Consultancy
services for improving electrical system reliability and stability. This
includes, a)
Review of basic design of electrical system. b)
Review of protective system, protection scheme and control logics. c)
Carry out Power System Studies
i) Load Flow study.
ii) Short Circuit Study.
iii) Relay setting and Relay co-ordination study.
iv) Unit protection settings for Motor and Generator Protection relays d)
Integration of new 11kV, 18 MW power plant and
existing 11kV e)
Protection system design for continuous parallel operation of existing f)
Transient Stability studies. g)
Engineering of Grid Islanding scheme h) Engineering of Load Shedding scheme. |
|
84.0 |
Associated Cement Cos. Ltd. Wadi Cement Works, Karnatka. (CPP) |
Relay
co-ordination study for Existing plant, New plant and Captive power plant of
ACC Wadi of 3 x 25 MW generation. This includes, i)
Preparation of Single Line Diagram. ii)
Carrying out Short Circuit Study. iii) Carrying out Relay setting and co-ordination study. |
|
83.0 |
Deepak
Fertilizers and Petrochemicals Corp. Ltd. Taloja |
a)
Electrical system studies This includes,
i) Load Flow Study
ii) Short Circuit Study.
iii) Motor starting
iii) Load Flow study with new system additions.
iv) Feasibility of system for various option. b)
Grid Islanding and Load Shedding scheme.
i) Transient Stability studies
ii) Prepare GIS scheme
iii) Prepare LSS scheme with both MW based and frequency based.
iv) Prepare specification of GIS and LSS scheme equipments. v) Relay settings of various protective relays used for GIS and LSS. |
|
82.0 |
Jindal
Steel and Power Ltd. Raigarh (Chattisgarh) |
Power
system design engineering at Raigarh, Chattisgarh. This includes, a)
Preparation of Key Single Line Diagram b)
Carrying out Short Circuit Study. c) Relay setting and Relay Co-ordination |
|
81.0 |
Indo Rama Synthetics (I) Ltd., |
Consultancy
Service for Relay Setting, Relay Co-ordination and Grid Islanding & Load
Shedding Scheme engineering for 2 x 15.0 MW Captive Co-generation Thermal
Power Plant, 3 x 13.5 MW + 3 x 4 MW DG
Power Plants and Grid System at our Plant Butibori,
The
scope includes, a) Relay
Setting and Relay Co-ordination study for electrical distribution i. Short Circuit study. ii.
Protection Review. iii.
Relay Setting and Relay Co-ordination. iv.
Working out Unit Protection Settings. b) Grid
Islanding and Load Shedding Scheme. i. Load flow study. ii.
Transient stability study. iii.
Engineering of Grid Islanding and Load Shedding Scheme. iv.
Working out Relay setting for Grid islanding and Load Shedding |
|
80.0 |
Jindal Steel and Power Ltd., Raigarh |
Relay
Setting and Relay Co-ordination study for RUBM plant and 148” Plate Mill plant
electrical distribution system. This includes, a) Short
Circuit Study. b) Relay
Co-ordination study. c) Working out Unit Protection Settings. |
|
79.0 |
BG
Exploration and Production |
Relay Setting and Co-ordination
study for electrical system of Panna Platform
including. a) Short Circuit Study. b) Relay Setting and Co-ordination study |
|
78.0 |
Jindal Steel and Power Ltd., Raigarh |
Study of dynamic switching of HT Motors. |
|
77.0 |
ESSAR STEEL LTD., |
Study
of Capacitor banks & Unit Protections, a) Carrying
out Load Flow Studies for sizing of Capacitor banks and b) Working out Unit Protection Settings for HT and LT motors. |
|
76.0 |
Jindal Steel and Power Ltd., Raigarh |
Feasibility
Study of Power evacuation from 4 x 135 MW Captive Power Plant at Dongamohua, Tamara, Dist : Raigarh. This includes, a)
Feasibility Study for evacuation of power from 4 x 135 MW Captive b) Load
flow study & Short circuit study for
Option-1, i.e. for 4 x 135 MW c) Load flow study & Short circuit study for Option-2,
i.e. for 4 x 135 MW |
|
75.0 |
Jindal Steel and Power Ltd.
Raigarh, Chattisgarh |
Power
System Study for the electrical system including : a.
Load flow study b.
Short circuit study c.
Transient stability study in case of
i. Tripping of 220kV incoming CSEB lines at JSPL.
ii. Tripping of 250MW TG set at JPL. d.
Engineering an islanding scheme. e.
Engineering a load shedding scheme under following conditions
i. Tripping of 220kV CSEB lines at JSPL.
ii. Tripping of 250MW set at JPL. f.
Working out the settings for islanding relays and the load shedding blocks,
i. Tripping of 220kV CSEB lines at JSPL.
ii. Tripping of 250MW set at JPL. g.
Working out over current and earth fault relay settings for,
i. 220kV line from
JPL to OPJIP.
ii. 220kV line from OPJIP to JSPL.
iii. 220kV interconnection, i.e. power evacuation route from receipt of JPL
iv. JSPL TG sets power evacuation route up to 220kV
bus. h.
Working out voltage and frequency relay settings for following,
i. 220kV line from
JPL to OPJIP.
ii. 220kV line from OPJIP to JSPL.
iii. 220kV interconnection, i.e. power evacuation route from receipt of JPL iv. JSPL TG sets power evacuation route up to 220kV bus. |
|
74.0 |
PT Indorama Tbk (Polyester). |
a)
Power system studies. This includes,
i) Load Flow Study
ii) Short Circuit Study.
iii) Fault investigation and disturbance analysis for a cable fault of
iv) Power supply distribution and modification. b) Relay setting and co-ordination study |
|
73.0 |
Essar
Steel Ltd. Vizag. |
Power
system design engineering at Vizag (A.P.). This
includes, carrying out a)
Load Flow Studies for sizing of capacitor banks and identifying b) Working out Unit Protection settings for HT and LT motors. |
|
72.0 |
PT.
Indorama Synthetics Tbk, Polyester Division, |
Deputation of Sr. Executive to site occurrence analysis. This includes carrying out data collection, review, analysis and investigation and submission of detail analysis report. |
|
71.0 |
GRASIM INDUSTRIES LTD, (CHEMICAL DIVISION.), Nagda |
Power
System Study for the electrical system including : a) Load
Flow Study b) Short
Circuit Study c) Relay Setting and Relay Co-ordination Study |
|
70.0 |
Jindal Stainless Ltd. Jajpur, Orissa |
Power System Study for the
electrical system including : a. Prepare and submit key
single line diagram (220 kV) relevant to the i. Augmentation of existing yard keeping the 220 kV
switchyard at the
ii. Construction of new 220 kV switchyard at suitable
location. b. Carry out the load flow
study to identify the basic rating of the equipments c. Work out Voltage &
Frequency profile at load centers for the two options i. Steady state condition & ii. Dynamic
condition of the load. d. Carry out Short circuit study
for three phase faults and phase to earth e. Define basic rating of the
major equipments such as : i. Transformers ii. Cables f. Examine
suitability of equipments already in service from view point of g. Stability studies to be
carried out for following conditions: i. Load flow studies for different grid and
captive generators operating ii. The effect of dynamic loads of SAF, EAF and rolling
mills on the grid iii. The
operations of the plant with / without GRID and with different h. Carrying
out following power system studies to develop the application of
i. Transient
stability study. ii. Study
to evaluate critical clearance time for fault at 220 kV Gridco
Bus, i. Engineer
a Grid islanding scheme for isolating the in-house Captive j. Engineer a Load Shedding Scheme, to ensure the
survival of CPP on k. Prepare
and submit, purchase specification for GIS and LSS panel. l. Review
of vendor drawings for GIS and LSS panel m. Relay setting for GIS and LSS scheme relays and relay setting
and |
|
69.0 |
Kamal Engineering Consultants,
|
Carrying out Relay Setting, Relay Co-ordination and harmonic analysis for District Cooling plant project. |
|
68.0 |
CAIRNS
ENERGY INDIA PTY LIMITED, |
Restricted Neutral Earthing study. This includes, a) Design the Grounding arrangement for 415Vsystem. b) Review of
existing electrical equipment in the electrical system for c) Define the
design parameters and detailed technical specifications for d) Design of
protective relaying system with specification of equipment such e) Relay Setting and Relay Co-ordination for existing protective relays. |
|
67.0 |
JINDAL STEEL & POWER LTD., Raigarh |
Study of dynamic switching of HT Motors. |
|
66.0 |
CHEMAF
S.P.R.L., ( |
Feasibility study of Load Flow, Short Circuit and Relay Co-ordination of existing Plant electrical distribution system and upgrading the same with upcoming new requirements / projects. |
|
65.0 |
ACC Limited. Kymore Cement Works, M.P.
|
Power System Study for the electrical system including : a) Relay Setting,
Relay Co-ordination and Unit Protection settings of New b) Review of
synchronizing scheme of New 25 MW captive power plant and c) Relay Setting for the emergency Power supply to NEW 25 MW CPP. d) Review of
Grounding system of old CPP, existing 25 MW CPP, new e) Relay Setting
and Relay Co-ordination of entire electrical system with f) Study of lightning arrestor installation throughout plant. g) Design of Load Shedding Scheme. |
|
64.0 |
Essar
Steel Limited, |
Power System Study for
the electrical system including : a) Short circuit
study. b) Relay Co-ordination study. c) Unit
protection relay settings for Generators, Transformers and Motors of d) Grid Islanding
Scheme (GIS) and Load Shedding Scheme (LSS). This
i. Transient stability
study.
ii. Study to evaluate critical clearance time for fault at 132 kV
APSEB
iii. Load flow study. iv. Engineering Grid Islanding Scheme. v. Engineering Load Shedding Scheme. |
|
63.0 |
Ambuja
Cement Ltd. Chattisgarh. (CPP) |
Rationalization of Power System (Neutral Grounding) at Bhatapara. |
|
62.0 |
Sterlite Industries (I) Ltd., Tuticorin, Tamil Nadu |
Load flow study involving Generator and generator transformer vis-à-vis power evacuation to specify the basic parameters of generator transformer. |
|
61.0 |
PT Indorama Synthetics |
Power System Study for the
electrical system including : a) Short circuit
study. b) Relay Setting and
Co-ordination of 2 X 30 MW Power Plant. c) Unit protection settings d) Transient Stability
Studies. e) Design Engineering of
Grid Islanding Scheme (GIS) and Load Shedding |
|
60.0 |
Emami Paper Mills Ltd.,
Balasore, Orissa |
Power System Study for the
electrical system including : a) Load flow, stability and
motor starting study. b) Short circuit and Relay Co-ordination
study. c) Unit protection relay
settings for Generators, Transformers and HT d) Design, engineering of
Grid Islanding (GIS), Load Shedding (LIS) |
|
59.0 |
Harihar Polyfibres Ltd., |
Power system study for electrical
distribution system including : a) Load Flow Study b) Short Circuit Study. c) Relay Setting and
co-ordination. d) Transient stability
study. e) Design of PLC based Grid
Islanding, Load Shedding scheme and |
|
58.0 |
Essar
Oil Ltd., |
Power System Study for the
electrical system including : a) Basic Engineering of Grid
Islanding and Load Shedding Scheme for b) Engineering a Load
Shedding Scheme to operate after successful Grid c) Prepare and Submit
purchase specification for GIS and LSS panel. d) Technical scrutinies of offers received from vendors and submit e) Carry out Transient Stability
Studies to evaluate Critical Clearing Time f) Review of Vendor
drawings for GIS and LSS panel. g) Relay setting for GIS and LSS scheme relay. |
|
|
|
|
|
57.0 |
Indian
Farmers Fertiliser Copoperative
Ltd., Paradeep Unit, |
Study of Existing system control scheme for Tripping of Generator Breakers & Turbine under various conditions of Fault. |
|
56.0 |
The
Associated Cement Kymore Cement Works, M.P. |
Relay Co-ordination Study for 8 MVA
Transformer and Quarry Electrical System including, a) Preparation of Key single
line drawings indicating the protection system. b) Short circuit study and
Relay Setting Co-ordination. c) Identifying lacunas in
existing protection system and d) Unit Protection Setting. |
|
55.0 |
BG
Exploration and Production |
Relay Setting and Co-ordination
study for electrical system of Tapti Platform
including. a) Short Circuit Study. b) Relay Setting and
Co-ordination. c) Unit Protection Settings. |
|
54.0 |
Jindal Steel & Power Ltd. Raigarh |
Carrying out Load flow study of 220 KV network of JSPL, JPL, CSEB for Power evacuation for IX250 MW power plant at JPL through 220 KV network. |
|
53.0 |
ACC, |
Power system study for electrical distribution
system including : b)
Relay Setting and co-ordination. c) Unit Protection. |
|
52.0
|
Ultra Tech, |
Power system study for old STG + GTG electrical
distribution system including : b)
Relay Setting and co-ordination. c) Transient
stability study. d)
Design of PLC based Grid Islanding, Load Shedding scheme |
|
51.0 |
Hindustan
Lever Ltd.,
Sewri (Mumbai)
|
Power system
study for electrical distribution system including : a) Short Circuit Study. b)
Relay Setting and co-ordination. c) Unit protection for transformer. |
|
50.0
|
Joint Operations, |
Power system
study for 3.3kV, 11kV and downstream distribution system of Joint operation, Wafra including : a)
Load Flow Studies b)
Short Circuit Study. c)
Relay Setting and co-ordination. d) Transmission Line Sag Calculation. |
|
49.0
|
Kuwait National Petroleum Co., |
Power
system study for electrical distribution system of 3Nos. Frequency Converter
Units, 13.8kV, 2.4kV and 480V distribution system at Mina Abdulla
Refinery a)
Short Circuit Study. b)
Relay setting and co-ordination. c) Unit protection settings
for Synchronous Motor, Synchronous |
|
48.0
|
IPCL |
Power system
study for electrical distribution system for 6.6kV switchgear replacement
including : a)
Relay setting and co-ordination. b) Unit protection for Motors. |
|
47.0
|
Gujarat Ambuja Cement |
Power
system study for electrical distribution system including : a)
Short Circuit Study. b)
Relay Setting and co-ordination. c) Unit protections for transformer, motor. |
|
46.0
|
Joint Operations - through Heavy |
Power system
study for 34.5kV, 4.16kV and 0.48kV distribution system including : a)
Short Circuit Study. b)
Relay Setting and co-ordination. c) Unit protections for transformer, H.T. Motors. |
|
45.0
|
Hindustan Lever Ltd., Sumerpur |
Power system
study for electrical distribution including : a)
Short Circuit Study. b)
Relay Setting and co-ordination. c) Unit protections for transformer, generator. |
|
44.0
|
Sterlite Industries Ltd., Tuticorin |
Power system
study for electrical distribution including : a)
Short Circuit Study. b)
Relay Setting and co-ordination. c) Unit protections for generators, transformers. |
|
43.0
|
Madras Aluminium Company Ltd., Mettur |
Power
system study for electrical distribution system based on enhanced generating
capacity, this includes: a)
Transient stability study of the electrical system b)
Fault level calculation study, from 110kV up to MCC c)
Relay setting and relay co-ordination from 110kV up to MCC d)
Unit Protection for Generators, Transformers. e)
Study of electrical interlocks for plant electrical system. f) Review
battery banks capacity and D.C. distribution system. g)
Review of earthing and grounding system emergency
power |
|
42.0
|
Hindalco Industries Ltd., Dahej |
Feasibility Study for Islanded Operation of 60 MW TG set |
|
41.0
|
Grasim Industries Ltd., Nagda |
Study of effect on entire electrical distribution system due to additional 5.515
MW TG set including, a)
Short Circuit Studies b)
Relay setting and co-ordination c)
Unit Protection for Generators, Transformers |
|
40.0
|
Hindalco Industries Ltd., Dahej |
Power
System Study for electrical distribution system of |
|
39.0
|
Hindalco Industries Ltd., Dahej |
Feasibility Study for
starting of 3 Nos 7.75 MW motors |
|
38.0
|
Hindalco industries Ltd., Dahej |
Feasibility Study for starting of 2 Nos 4 MW motors |
|
37.0 |
Oswal Chemicals and Fertilizers
Limited, |
Working out
Motor Protection Relay Settings for 6.6 kV Motors |
|
36.0
|
Hindustan Lever Ltd., |
Power
System Study for electrical distribution system including a)
Short Circuit Studies b) Relay setting and co-ordination |
|
35.0 |
Hindalco industries Ltd., Dahej |
Detail
engineering for hookup of Oxygen plant electrical system with existing MRSS system. |
|
34.0 |
Hindustan Lever Limited, Nashik |
Power
System Study for electrical distribution system including : a)
Short Circuit Studies b)
Relay setting and co-ordination c) Unit Protection Studies. |
|
33.0 |
Hindustan Lever Limited, Andheri, Mumbai |
Power
System Study for electrical distribution system including : a)
Short Circuit Studies b)
Relay setting and co-ordination c) Unit Protection Studies. |
|
32.0
|
The Associated Cement Companies Ltd., Jamul
Cement Works, Chattisgarh. |
Power
System Study for electrical distribution system including : c)
Work out Unit Protection Settings of Transformer, HT Motors, |
|
31.0
|
The Associated Cement Companies Ltd., Keymore Cement Works M.P |
Power
System Study for electrical distribution system including : c)
Work out Unit Protection Settings of Transformer, HT Motors, |
|
30.0
|
Hindustan Lever Limited, Andheri - Mumbai |
a)
Preparation of detail Single Line Diagram of
11kV and 415 V ·
Electrical
system adequacy from operation view point. equipments ·
Review
of installed / supplied and in operation. · Compliance of statutory requirements. |
|
29.0 |
Schenectady Herdillia Limited, Navi Mumbai |
Electrical
System study of entire electrical distribution system
including |
|
28.0 |
Ambuja Cement Eastern Limited, Rawan, Chattisgarh. (CPP) |
Electrical
System study of entire electrical distribution system
including |
|
27.0 |
The Associated Cement Cos. Limited, Madukarai Cement Works, (CPP) |
Electrical
System study of entire electrical distribution system
including |
|
26.0 |
ESSAR
Steel Limited, Hazira |
System study of electrical system of
HBI Plant, including:
10 MW STG
10 MW STG |
|
25.0 |
Steel
Authority Of India Limited, |
Electrical
System study of entire electrical distribution system
including h)
Auto Changeover Scheme i)
Mesh Distribution System j) Review of Neutral Grounding and Protection System |
|
24.0 |
Ruchi Soya Industries Ltd., |
Feasibility study for 7.5 MW co-generation power plant. |
|
23.0 |
Atul Ltd., Valsad |
Electrical
System study of entire electrical distribution system
including
a)
Relay setting, Relay co-ordination of existing system. b)
Modifications of Grid Islanding and Load shedding scheme |
Update : 05.05.12