| SR. NO. | NAME OF THE COMPANY / REPEAT ORDERS RECEIVED |
SERVICES OFFERED |
DETAILS OF JOB EXECUTED |
| 5. | M/s.
Hindustan Petroleum Corpn. Ltd., Bombay. |
Reliability Improvement Exercise |
Testing of switchgear panel checks including protective relays. |
| 1983 to 1989, 1990, | Power Plant | Testing & Commissioning of 3x10MW G.T. set and its electrical system equipments. | |
| 1991, 1992, 1994, | |||
| 1995, 1997-98, 2001, 2003 | Consultancy services | a)
Detailed design engineering and consultancy for Hexane Maximisation project. |
|
| b)
Detail engineering consultancy for their electrical system revamping project, GEC group and major projects group. |
|||
| c)
Consultancy services, testing & commissioning of 4 MVA Transformer and its electrical system for BPPL Project. |
|||
| System study | Review
of existing protection system & workout relay setting and co-ordination of complete electrical system. |
||
| Revamping
and modernisation of system |
Revamping
of 6.6KV Motor Feeder protections including design, installation, testing and commissioning. |
||
| Consultancy service | Refinery
Expansion : Detail Engineering & erection supervision for M. S. Maximisation -upgradation of electrical facilities at fuels refinery. |
||
| System study | System
studies for working out Relay setting & co-ordination for Fuels refinery, Lube refinery. |
||
| System study | Power Factor Improvement, Energy Power Factor Measurement and Reactive Compensation Study. | ||
| System study | System Study of Electrical distribution system of Mumbai-Pune Pipeline Division from 22 kV to 415 V system | ||
| 4. | M/s.
Bharat Petroleum Corpn. Ltd., Bombay. |
Reliability Improvement Exercise |
Testing
of protective relays of complete electrical system. |
| 1984, 1986, 1989, 1991, 1992, 2001 | Power Plant | Associated
in testing and commissioning 22.5 MW GT set & its electrical equipments. |
|
| Reliability Improvement Exercise |
Modification
of trip logic of 22.5 MW G.T. Set as class ABC for selective operation of Generator circuit breaker, field circuit breaker and turbine trip solenoid valve. |
||
| Relay Testing | Testing of GTG-2 Protective relays | ||
| 2004 | Reliability Improvement Exercise |
Testing and Commissioning of Gas Insulated panels, Synchronization, Control and Annunciation panels, Import/ Export Limiter panel for 2 Nos TCE incomers, 2 Nos 18 MW Generators and 1 No 33 MW Generator. | |
| 2006 | Relay Testing | Testing of relays CTs, PTs, Breakers, VCBs and ACB | |
| 3.
|
M/s
Oil & Natural Gas Corporation, Uran. |
Power Plant-Reliability Improvement Exercise |
Testing
of 2Nos,20 MW G.T. set's Asea make Combiflex type protective relays. |
| 1987, 1989, 1992 | |||
| 2.
|
M/s Oil & Natural Gas Corporation, Hazira. | Reliability Improvement Exercise |
Testing of GEC make static generator Protection relays. |
| 1993 | |||
| 1. | M/s
Oil & Natural Gas Corporation's Offshore Platforms - |
System
testing & trouble shooting |
Testing and calibration of electrical system protective relays and testing of HT switchgears. |
| a)
WIN Platform 1993, 1994, 1998 |
|||
| Study,
review and testing commissioning of 6.6KV Motor Protection scheme and working out fresh relay setting and co-ordination |
|||
| b) BHN Platform | Modification
of generator Differential Protection scheme. |
||
| 1993, 1997 | |||
| c) BLQ - BPA Platform | Testing
and calibration of electrical system protective relays |
||
| 1995, 1997 | |||
| d) Infill Complex | Study,
review, design, testing and commissioning of
synchronizing scheme for power transfer from ICG-Emergency DG to ICP 415V Bus. |
||
| 1995, 1997 | |||
| e) NQO-NQP Platform | Testing
of electrical system relays and H.T. Switchgears. |
||
| 1995, 1997 | |||
| f) SH platform | Testing
of Electrical System and protective relays and equipments. |
||
| 1998 |