SR NO. CLIENT / SERVICES TYPE OF JOB
61 Deepak Fertilisers and Chemicals Limited, Taloja Design Engineering for additional load – ASHU Plant at Taloja.
The Scope of work shall include,
1. Review of Load Flow, Feasibility Check.
2. Engineering for tapping point.
3. Detail engineering for new switchboard.
60 ACC, Kymore The Scope of work shall include,
1. Protection Relay Setting job at NCPP.
2. Removal of 3.3 kV ASEA, MOCB Switchboard.
59 Hazira LNG Pvt. Ltd. Gujarat The Scope of work shall include,
1. Review of improve of existing Grid Islanding Scheme.
2. Working out Grid Islanding Relay Settings.
3. Suggesting suitable interlocks.
58 ACC, Kymore Removal of 3.3kV ASEA, MOCB Switchboard.
The Scope of work shall include.
1. Review of Existing Equipment rating and protections.
2. Prepare purchase specifications of protective relays.
3. Cable sizing.
4. Preparation of power cable schedule.
5. Modification in AC/DC schematics.
6. Work out relay settings.
57 ACC, Kymore Design Engg. Services for disconnection of parallel operation between CPP and Grid.
The scope of work shall include,
1. Detail Engineering of new 132kV, 8/10MVA transformer bay :
Design and Detail Engineering of 132kV Transformer Bay, this will include the following,
I. Preparation of Key single line diagram for 8/10 MVA transformer bay. (from 132 kV Primary side upto 6.6 kV incomer)
II. Preparation of functional procurement specifications for 132kV Switchyard equipments,
Isolator, Current Transformer, Potential Transformer, Circuit Breaker, Lightning Arrestor, Transformer Control Relay panel and Cable end termination kits.
III. Preparation of layout drawings for various equipments.
IV. Preparation of Earthing Layout.
V. Preparation of cable tray routing and trench routing.
VI. Carrying out power and control cable sizing and preparation of power cable and control cable schedule.
VII. Preparation of Interconnection drawing for control circuit and interlocks.
VIII. Review of Technical offer and vendor drawing review of the equipments.
IX. Modification of Relay setting and Relay Co-ordination for the modified system.
2. Modification in 11kV LC-3 Switchgear :
I. Preparation of,
i. Single Line Diagram with protections and Interlocks for modified electrical system.
ii. Functional Purchase specifications of New 11kV switchgear at LC-3 Substation.
iii. Layout drawing of 11kV LC-3 switchgear.
II. Carrying out power and control cable sizing
III. Preparation of Interconnection drawing for control circuit and Interlocks.
3. Modification in GT-1 CRP :
Following Engineering Services for modification of GT-1 Control relay panel :
Design and engineering of Transformer protection, recommendation and purchase specification of new numerical relays, Master trip and Auxiliary relays.
56 ACL, Bhatapara Design Engineering for 132 kV Switchyard Bay No.2 Protection Relay Setting and Relay Coordination.
55 Thirumalai Chemicals Limited (TCL), Ranipet Design Engineering Services – comments on electrical feasibility in 5 MW Alternator.
54 ACC, Kymore Design Engineering for conversion of 6 Nos. 6.6 kV BFP Motor Feeders to 415V VFD fed BFP motor feeders at 50 MW CPP.
The Scope of work shall include,
1. Prepare and submit Single Line Diagram with Recommended Protections for VFD transformer.
2. Study and recommend protection relay model for VFD transformer feeder.
3. Cable sizing for power cables for VFD transformer and submit power cable schedule.
4. Preparation of new Autocad drawings after carrying out modification in AC and DC schematic drawings with revised protection.
5. Work out Relay Settings for recommended relays maintaining relay co-ordination with existing system.
53 ACC, Kymore Providing Design Engineering Services for Raw Mill Motor – 1.
The Scope of work shall include,
1. Review of Motor specification and name plate details.
2. Study the Motor Characteristics.
3. Work out detailed Motor Protection Relay Settings for Raw Mill -1 Motor for,
i. Areva Make Micom P220 – Motor Protection Relay and
ii. ABB Make RADHA – Motor Differential Relay.
4. Prepare Schematic and Relay Connection Diagram for installation of Micom P220 Relay.
5. Engineering Review, Technical Assistance for changes and Motor commissioning trial runs being carried out at site.
52 ACC, Kymore Design Engineering Services for Evacuation of Additional 7MW Power through new 8 MVA Transformer.
The Scope of work shall include,
1. Basic Design Engineering For,
i. Protection of new 8 MVA, 11/3.3kV transformer, recommendation and preparation of specification of new numerical relays, Master trip and Auxiliary relays.
ii. Review of existing protection scheme, prepare and submit Single Line Diagram with protections for modified electrical system.
2. Procurement Assistance,
i. Preparation of purchase specifications of new 8 MVA, 11/3.3kV transformer.
ii. Preparation of specifications for the replacement / modification of,
a) 11kV switchgear Panel P06 at TG-5 bus.
b) 3.3kV switchgear Panel LC-5 – P20 at LC-5 bus.
iii. Preparation of purchase specifications for the new cables.
iv. Preparation of purchase specifications for loose protection relays for this circuit.
3. Detail Design Engineering
i. Carry out power and control cable sizing.
ii. Preparation of power cable and control cable schedule.
iii. Preparation of control cable interconnection diagram.
iv. Modification of Relay setting and Relay co-ordination for the modified system.
v. Preparation of Transformer Layout drawing.
vi. Review of Vendors Technical offer, Discussion and correspondence with vendor; carry out tender analysis, offer evaluation and forward purchase recommendation.
vii. Review Vendor drawings for the modified 11kV switchgear and 3.3kV switchgear.
51 PT IndoRama Polychem Indonesia (IPCI) Carrying out Power System Study of Electrical Distribution System of CP-4.
The Scope of work shall include,
1. Review of existing protection application, identify deficiencies if any in protection application and suggest missing protection. Provide functional specification for additional relays suggested.
2. Carrying out Short Circuit Studies at various location in electrical distribution system for normal operating condition to identify the Phase to Phase and Phase to Ground Fault Current.
3. Carry out,
i. Phase Fault Relay Co-ordination and
ii. Ground Fault Relay Co-ordination.
4. Work out Unit Protection settings for,
i. Generators,
ii. Transformers,
iii. MV Motors,
iv. LV Motors.
5. Load Flow study.
6. Review of Grounding Method and its operating practice.
7. Engineering Grid Islanding & Load Shedding Scheme for continuous parallel operation.
50 The Madras Aluminum Co. Ltd., Salem, T.N. Feasibility study for Hookup of new 8.4 MVA Generator on 6.6 kV ST-2 Switchgear.
The scope of work shall include,
1. Preparation of SLD with Control, Protection and Metering system to indicate the hookup of new generator
2. Review of Grounding of new Generator and ST-2 transformer on 6.6 kV side.
3. To check the rating of ST-2 transformer and its Vector group for parallel operation of new generator and ST-2 transformer.
4. Preparation of phasor diagram to verify the vector group for parallel operation.
5. Checking the feasibility of synchronizing new generator and ST-2 transformer at 6.6 kV voltage level.
6. Short Circuit Study,
i. To verify the device capability
ii. To check the feasibility of paralleling ST-1 and ST-2 transformer.
49 IOT Infrastructure & Energy Services Ltd., Mumbai Detail Engineering Services for Electrical and Instrumentation System.
1 x 300 MW Power Plant for Maruti Clean Coal & Power Ltd.
1. Preparation of Electrical System single Line Diagram and Instrumentation PID.
2. Procurement Services: This includes,
i. Preparation and submission of Electrical and Instrumentation equipment specification for CHP plant.
ii. Review of the technical offers received from vendors and submission of technical tender analysis and recommendations.
3. Carrying out Detail Design Engineering related to,
i. Preparation of single line diagram including protection system and Instrumentation PID.
ii. Electrical equipment layout engineering.
iii. Power and control Cable engineering.
iv. Earthing system engineering.
v. Lighting system engineering.
vi. Lightning protection engineering.
vii. Interconnection diagrams for control function.
viii. Protection system setting and coordination.
ix. Instrumentation system:
Preparation and submission of IO list.
Preparation and submission of instrumentation logic.
Preparation and submission of interconnection wiring diagram.
4. The review of Vendor Drawings.
48 ACC Limited, Kymore Cement Works Design and Engineering Services for 132 kV switchyard modifications for export of power of ACC, Kymore.
1. System Study of,
i. Existing power distribution scheme of operation of TG set.
ii. Existing Operation of export of power through TG sets and existing transformer.
iii. Existing Scheme of load control with Grid and Load Sharing of TG sets without Grid.
iv. Existing Grid Protection Scheme for Grid failures and Load Shedding Scheme.
2. Design Engineering Scheme for,
i. Export of power after replacement of existing 8/10 MVA, 132 / 6.6 kV transformer by 31.5 MVA, 132 / 11 kV transformer.
ii. Synchronizing TG4, TG5 each of 25 MW rating and 132 kV Grid at 11 kV Bus level through existing or new synchronizing panel.
iii. Load Control Sharing between TG4, TG5 and Grid feeder and Load Shedding.
3. Procurement Assistance of Various Equipments.
4. Detail Design Engineering for ,
i. Preparation of layout drawings for various equipments.
ii. Preparation of cable tray routing and trench routing.
iii. Carrying out power and control cable sizing and preparation of power and control cable schedule.
iv. Submission of as built drawings.
47 ACC – Holcim – Ambuja, (Bhatapara Cement Plant Unit) Design, Procurement, providing Consultancy services for extension of 132 kV switchyard bay for Transformer.
46 Punj Lloyd PTE Ltd. / PT. Makmur Sejahtera Wisesa (MSW), Indonesia Providing Electrical Engineering Consultancy Services for 2 X 30 MW, Coal fired Power Plant project at Tanjung – Tabalong, Indonesia
45 Deepak Fertilizers & Petrochemical Corporation Ltd., Taloja April 2013 1. Engineering consultancy services for Retrofitting of AEI make protective relays in IPA plant.
2. Engineering consultancy services for Retrofitting of UE make protective relays in Ammonia plant.
44 ACC Limited, Kymore Cement Works., Katni (M.P.), August 2012 Design and Engineering Services for new addition of 7 MW Waste Heat Recovery System (WHRS) Generator at ACC Kymore.
The scope of work shall include,
1. Preparation of conceptual SLD with control and protection system for 7 MW WHRS generator i.e. from 7 MW Generator to 11 kV Incoming Switchgear panel.
2. DFeasibility study to identify the power connection of 7 MW WHRS Generator on HV Bus. This will include,
i. To check the availability to suitable switchgear panel technically at 11 kV HV switchboard.
ii. Identify the breaker ratings, protection system of the feeder panel or specify new feeder requirement.
3. Short Circuit study (Device Duty) shall be carried out to check acceptability of the existing switchgear.
4. If short circuit levels are above the present switchgear ratings, examine and suggest the alternative of suitable “current limiting device” to limit the fault level.
43 Siemens – Hazira LNG Pvt. Ltd., Surat, July 2012 Power System Study and Consultancy Services for LNG Hazira Project.
1. Engineering of grid Islanding and Load Shedding scheme & Engineering of Load sharing and synchronizing scheme.
2. Procurement specification for engineering scheme.
3. Study and finalizing reactive power requirement and equipment rating specifications.
4. Power system study. This will include
i. Data compilation
ii. Electrical system modeling on ETAP software,
iii. Load flow study on ETAP software & lump load and
iv. Transient Stability Study.
5. Balance Engineering Activities such as,
i. Technical tender analysis and purchase recommendation for the procurement of equipment
ii. Vendor drawing review for equipments on order and.
iii. Preparation of control cable schedules and interconnection schedules.
42 Deepak Fertilizers & Petro Chemicals Corporation Ltd., Taloja Consultancy services for carrying out Feasibility study of connecting new Generator to 3.3 kV ANP Bus.
Scope of work includes,
1. Short Circuit Study.
2. To develop operating philosophy of the plant.
3. Voltage dip study.
4. Preparation of functional specification of Generator, Transformer and switchgear neutral grounding resistor etc.
5. Technical Engineering document review.
6. Review logic of Load Shedding scheme and power management system.
7. Relay setting and Relay co-ordination.
8. Detail engineering for Generator Transformer.
41 Ultratech Cement Ltd. (GCW Cement Plant) Kovaya, Gujarat Consultancy Service for 1 No. 220 kV switchyard bay addition for Transformer.
This includes,
1. Preparation of design basis report and the summary.
2. Preparation of Key Single Line Diagram and detail SLD for the proposed bay.
3. Preparation of Plan drawings for 220 kV Bay.
4. Carry out Basic design, finalizing equipment rating, procurement assistance by providing
i. Purchase specifications on turn key basis.
ii. Techno commercial scrutiny of vendors offer.
iii. Review of Vendor design and Vendor drawing of all switchyard equipments.
40 British Gas Exploration and Production India Ltd., Tapti October 2011 The scope of work shall include following activities,
1. Preparation for engineering scheme for synchronizing TPP TG/EG and TR-110 Feeder & for export of Emergency power of
200 KW, from TCPP to TPP platform using the TCPP Diesel Generator & Vise Versa.
2. Preparation of specification of equipment, data sheet.
3. Preparation of report for the proposed modification with revised operating philosophy.
4. Preparation of cable schedule, inter-connection diagrams.
5. Preparation of ITP (Inspection Test Procedure) for commissioning the system.
6. Preparation of Single Line Diagrams, preparation of data compilation report by modeling TPP & TCPP Electrical System on ETAP.
7. Carrying out following power system studies for TCPP & TPP Electrical Distribution System.
i. Load Flow Study.
ii. Short circuit studies (Phase to phase and phase to earth fault calculation to check the fault level).
iii. Relay Setting, Relay Co-ordination for and Earth fault relay and
iv. Unit protection settings for Generator, Transformer and Motors
39 Ultratech Cement Ltd. Kovaya, Gujarat Consultancy services for carrying out 66 kV switchyard modification and system study. This includes,
1. To check the feasibility and rating of 66 kV additional bus coupler bay.
2. Detail Engineering and purchase specification of 66 kV equipments.
3. To prepare drawing for electrical inspector approval.
38 Gujarat Ambuja Cements Ltd., Bhatapara (Cement Mill-3 Close Circuit and VRPM) Engineering Services for Cement Plant (CM-3) at Bhatapara Project, Chhatisgarh. This includes engineering for,
1. Cable Engineering
2. Earthing system Design
3. Review of drawings
4. Preparation of drawings
5. Lighting system design
6. LBS interconnection and Cable schedule
7. Relay Setting and Relay co-ordination for new plant electrical system only.
37 Gujarat Ambuja Cements Ltd., Bhatapara (Cement Mill-2 Close Circuit and VRPM) Engineering Services for Cement Plant (CM-2) at Bhatapara Project, Chhatisgarh. This includes engineering for,
1. Cable Engineering
2. Earthing system Design
3. Review of drawings
4. Preparation of drawings
5. Lighting system design
6. LBS interconnection and Cable schedule
7. Relay Setting and Relay co-ordination for new plant electrical system only.
36 Madras Aluminium Co. Ltd. Salem Engineering services for,
1. Modification of AC and DC Schematic Diagram to incorporate
i. MICOM P543 protection Relay.
ii. MICOM P127 Protection Relay.
2. Recommendation for hooking up the required protections available in MICOM P543 and MICOM P127 at both the ends of the line based on the application.
3. Working out protection relay setting and relay configuration for TNEB Line-3 protection for proposed operating condition.
35 Gujarat Ambuja Cements Ltd., Nalagarh Unit Engineering Services for Cement Grinding Unit at Nalagarh
The scope includes,
1. Relay Setting and co-ordination for plant.
2. Requirement of cable trays & quantity of steel.
3. Preparation of single line diagram.
4. Cable Engineering
5. Review for Drawings
6. Preparation of Drawings
7. Lighting system design
34 Ruby Mills Limited., Mumbai Consultancy services for electrical distribution system for a new Textile Process House at Khopoli. This includes,
1. Preparation of Detail Single Line Diagram, indicating protections, metering and rating of equipments etc.
2. Preparation of purchase specifications.
3. Detail Design Engineering for,
i) Lighting system design.
ii) Earthing system design.
iii) Equipment layout drawings.
iv) Cable tray / trench layout.
v) Cable schedule and interconnection diagram.
4. Preparation of drawings / documents for statutory approval.
33 Gujarat Ambuja Cements Ltd., Rauri Engineering Services Cement Plant at Rauri Project, Himachal Pradesh. This includes engineering for,
1. Cable Engineering
2. Earthing system Design
3. Review of drawings
4. Preparation of drawings
5. Lighting system design
6. Relay Setting and Relay co-ordination for new plant electrical system only.
32 Madras Aluminium Co. Ltd. Salem Carrying out re-engineering of 2 Nos. 110 kV TNEB Line-1 and Line-2 protection relays with Areva make Micom P543 line management relay.
31 Gujarat Ambuja Cements Ltd., Dadri, U.P. Engineering services for local control station. This includes engineering for,
1. Location of Local Control stations near motors.
2. Location of control junctions boxes (J. B.) of each floor of plant building.
3. Location of local central JB at each building.
4. Location of central JB at USS building.
5. Control cables interconnection at USS building.
i. Local control station at local JB.
ii. Local JB to central JB plant building.
iii. Central JB plant building to USS building.
iv. USS building JB to MCC marshalling panel.
6. Preparation of control cable schedule.
30 Gujarat Ambuja Cements Ltd., Bhatapara Unit Line-2 Raipur, Chattisgarh. (Clinkerization Unit 2.5 MTpa) Engineering Services for Cement Plant at Bhatapara Project, Chhatisgarh. This includes engineering for,
1. Cable Engineering
2. Earthing System Design
3. Review of drawings
4. Preparation of drawings
5. Lighting system design
6. Relay Setting and Relay co-ordination for new plant electrical system only.
29 Gujarat Ambuja Cement Ltd. Bhatapara, Raipur Chattisgarh. (Power Plant) Engineering Services for Power Plant (15MW & 33MW) at Bhatapara, Chhatisgarh. This includes engineering for,
1. Cable Engineering
2. Earthing system Design
3. Review of Vendor drawings
4. Preparation of drawings
5. Lighting system design
6. Relay Setting and Relay co-ordination for new plant electrical system only.
28 GACL, Dadri, U.P. (Grinding Unit 1.25 MTpa) Engineering of Cement Grinding Unit at Dadri, Uttar Pradesh. The scope includes,
1. Short Circuit Study.
2. Relay Setting and co-ordination.
3. Cable Engineering.
4. Requirement of cable trays & quantity of steel.
5. Preparation of single line diagram.
27 Indo Rama Synthetics (I) Ltd., Nagpur. Consultancy Services for detail engineering for replacement of 25 MVA Transformer with 50 MVA Transformer at our Plant Butibori, Nagpur. This includes,
1. Review the specifications prepared by Indorama for 50 MVA transformer.
2. Preparation of Transformer layout, foundation drawing, Soak pit drawing, Cable schedule and Inter connection diagram.
3. Review and study the adequacy of existing system equipment
4. Design of protection system for 50 MVA transformer.
26 The Associated Cement Companies Ltd. Kymore Cement Works, M.P. Re-designing of 132kV Switchyard System. This includes,
1. Preparation of Detail Single Line Diagram.
2. Preparation of procurement specification.
3. Preparation of 132kV switchyard layout drawing.
4. Tender analysis of vendor offers and vendor drawings.
5. Relay setting & Relay Co-ordination for 132kV switchyard electrical system.
25 The Associated Cement Companies Ltd. Kymore Cement Works, M.P. Design Engineering Parallel operation of MPEB 33kV power with 25MW, TG-5. This includes,
1. Review of protection for parallel operation.
2. Review of existing synchronizing scheme.
3. Prepare specification for new hardware.
24 Hindalco Industries Ltd., Unit : Birla Copper, Dahej. Design, engineering modification in existing engineering drawings, schematic and control diagram for replacement of PPX relay to MICOM relay.
23 Grasim Industries Ltd., Nagda Power System Design for the electrical system including :
1. Review and approval of detail single line diagram of proposed 30 MW TG set electrical distribution system.
2. Review and approval of hookup of new 30 MW TG set with existing electrical system.
3. Suggest scheme for load sharing with existing TG sets
4. Suggest better alternative if any
22 Emami Paper Mills Ltd., Balasore, Orissa. Review of detail design engineering of 1 x 15 MW Captive Power Plant Electrical System and 132 kV Switchyard.
21 Gujarat Ambuja Cement Ltd., Surat, Gujarat. (Grinding Unit 1.0 MTpa) Power system study for electrical distribution system including :
1. Short Circuit Study.
2. Relay Setting and co-ordination.
3. Cable Engineering.
4. Requirement of cable trays & quantity of steel.
5. Preparation of single line diagram.
20 Gujarat Ambuja Cement Ltd. Roorkee, Uttaranchal. (Grinding Unit 1.25 MTpa) Power system study for electrical distribution system including :
1. Short Circuit Study.
2. Relay Setting and co-ordination.
3. Cable Sizing.
4. Requirement of cable trays & quantity of steel.
5. Preparation of single line diagram.
19 Gujarat Ambuja Cement Ltd. Farakka, West Bengal. (Grinding Unit 1.25 MTpa) Power system study for electrical distribution system including :
1. Short Circuit Study.
2. Relay Setting and co-ordination.
3. Cable Engineering.
4. Requirement of cable trays & quantity of steel.
5. Preparation of single line diagram.
18 Saudi Basic Industries Corporation (SABIC), Saudi Arabia Detail engineering for upgradation of existing UPS system for IT department. This includes,
1. Study / evaluate existing UPS Power System network and suggest rating of new UPS.
2. Preparation of technical specifications, drawings for the new equipments.
3. Preparation of drawings for layout of equipment, cable tray layouts etc.
4. Preparation of specifications for engineering package.
17 Atul Ltd., Valsad Detail engineering for modification required for hookup of 4 MW TG set.
16 Hindustan Petroleum Corp. Ltd., Mahul Detail engineering for modification of existing distribution system, replacement of M. V. switchgears, substation equipment layouts, modification of existing protection schemes etc.
15 Hindustan Lever Ltd., Sumerpur Preparation of detailed single line diagram of existing electrical system.
14 Madras Aluminiun Co. Ltd. Detail engineering for retrofit of Numerical Protection Relays in place of electromechanical relays for Generator Protection and Generator Transformer Protection. This include the modification of existing protection schemes.
13 Atul Ltd. Detail engineering for the modification of existing grid islanding scheme panels.
12 The Bombay Dyeing and Manufacturing Co. Ltd., Patalganga Feasibility study to check the adequacy of existing 220 kV system equipment to take care of start up and running loads considering the existing load and additional load.
11 Indo Bharat Rayon Ltd., Indonesia. Rationalization of Electrical Power Distribution, Power. Evacuation and Power System Studies. This includes:
1. Rationalization of Electrical Power Distribution.
2. Detail Engineering of Power Evacuation for New 2 x 10.8 MW CPP.
3. Rationalization of Power Source Grounding System.
4. Carryout Transient Stability Studies, Load Flow Studies, Short Circuit Studies and Relay Co-ordination Studies.
5. Design and Engineering of Grid Islanding Scheme and Post Islanding Load Shedding Schemes.
10 Gujarat Ambuja Cement Ltd., Ropar. Detail engineering and consultancy services for electrical system of 2 x 15 MW Captive Power Plant.
9 Birla Copper Ltd., Dahej 1 x 12.5 MW , 1 x 2.85 MW Co-generation Power Plant
1. Complete Design and Detail Engineering Services
2. Testing-commissioning of Power Plant and its electrical system equipments.
8 Melco India Pvt.Ltd., Faridabad, New Delhi 2 x 210 MW, Panipat Thermal Power Plant Ash handling plant Electrical system review, Design and engineering
7 Deepak Fertilizers & Petro Chemicals Corpn. Ltd., Taloja DG Power Plant feasibility report Under suspension, awaiting MSEB’s approval.
6 Thirumalai Chemicals Ltd., Ranipet Consultancy Services 2 x 1000 kVA DG Power Plant Complete design and detail engineering services.
5 Thirumalai Chemicals Sdn. Bhd., Malaysia Consultancy & Commissioning services Detail engineering and Testing Commissioning for 7MW T.G. Set
4 Gujarat State Fertilizers & Chemicals Ltd., Vododara Consultancy & Commissioning Services 1. Testing – Commissioning of Co-Generation plant with its electrical system.
i. Phase – I, 15MW T.G. Set.
ii. Phase – II, 25MW T.G. Set.
iii. Phase – III, 32+20MW Combined Cycle Power Plant.
2. Review of design engineering & Testing – Commissioning of25MW T. G. Set and its electrical system equipments of Ammonia – IV Plant.
3 Grasim Industries Ltd., Nagda Electrical System Studies and Commissioning Services. 1 x 40MW Co-Generation Power Plant
1. Relay setting and Co-ordination of Power Plant & electrical Protection system.
2. Testing – Commissioning of power plant & its electrical system equipments.
2 Birla Cellulosic, Kosamba Consultancy, Commissioning and supervision Services 2 x 15MW Co-Generation Power Plant
1. Detail design engineering.
2. Site-erection supervision
3. Testing – Commissioning of power plant and its electrical system equipments.
1 Atul Ltd., Balsar Consultancy & Commissioning Services 1 x 18MW Co-Generation Power Plant
1. Complete design and detail engineering Services.
2. Testing – Commissioning of power plant & its electrical system equipments.

PROJECTS WITH PARTNERS BHAGWATI POWER PLANT CONSULTANTS

SR NO. CLIENT / SERVICES TYPE OF JOB
1 Ambuja Cement Eastern Ltd. Turnkey Consultancy services Elect. + Mech. + Civil +Instrumentation with BPPC 1 x 20MW Thermal Power Plant.
a) Detail design engineering including
i) Unit Sizing.
ii) Hook up system design.
iii) Grounding system design.
2 Vikram Cement., Khor. with BPPC Feasibility Study for 2x20MW Thermal Power Plant.
3 Eurotex Industries & Export Ltd., Kolhapur. Turnkey Consultancy services Elect. + Mech. + Civil + Instrumentation (1 x 3MW ) + ( 1 x 4MW ) D. G. Power Plant.
a) Detail engineering,
b) Site erection supervision,
c) Testing – Commissioning.
4 Gujarat Sidhee Cement Ltd., Veraval Turnkey Consultancy services Elect. + Mech. + Civil + Instrumentation with BPPC 3 x 6 MW Power Plant.